Sports Facility Construction · Est. 2008

From Bare Ground
to Game Day.

We pour concrete, raise steel, and lay drainage so communities have somewhere to play by next season.

Empty dirt lot with caliche soil before construction, dry and barren under afternoon sun
Before
01
Community Park · Riverside, CASingle regulation soccer / multi-use field

Eastside Community Athletic Field

A barren 3.2-acre parcel behind an elementary school, plagued by caliche hardpan and no drainage infrastructure, transformed into a FIFA-standard natural-grass pitch serving 1,200 youth athletes per season.

Project Specifications

Site Acreage3.2 acres
Soil ConditionCaliche hardpan
Permit Duration11 weeks
Budget Range$680K – $720K
CompletionSpring 2023
SurfaceNatural Bermuda grass
Completed regulation soccer pitch with white field markings and surrounding fencing in overcast morning light
Completed

11 wk

Permit to sod

0M

Square feet graded

0

Facilities delivered on schedule

0

State compliance certifications held

Six completed hard tennis courts with blue and green surfaces, floodlights and pavilion visible in soft overcast light
Completed

6

USTA courts · 18-mo build

Raw graded site with orange construction fencing and survey stakes for tennis court layout
Before
02
Municipal Parks · Boulder, COSix-court all-weather complex

North Boulder Tennis & Racquet Center

Boulder Parks & Recreation needed six USTA-regulation hard courts, a covered spectator pavilion, and a night-play lighting system — all within a constrained 1.8-acre footprint adjoining a wetland buffer requiring Army Corps coordination.

Project Specifications

Site Acreage1.8 acres
Courts6 USTA hard courts
Permit Duration18 weeks (Army Corps)
Budget Range$1.4M – $1.55M
CompletionFall 2023
Lighting70-ft LED floodlights
0%

Of projects within 3% of budget

0

State grant applications supported

0yr

Average facility lifespan extension

Aerial view of raw 22-acre Texas site with survey stakes and initial grading underway at golden hour
Before
03
Private Academy · Austin, TX22-acre collegiate multi-sport complex

Lone Star Athletic Academy — Phase I

A private high-performance academy needed four FIFA-quality natural pitches, a 400m all-weather track, a 500-seat steel grandstand, and full floodlighting — all permitted, graded, and surfaced in 14 months so tryouts could open on schedule.

Project Specifications

Site Acreage22 acres
Fields4 FIFA-quality pitches
Track400m Mondo surface
Seating500-seat steel grandstand
Budget Range$6.8M – $7.4M
CompletionSpring 2024
Completed collegiate athletic complex with four pitches, running track, and steel grandstands catching morning light
Completed

14 mo

Dirt to game day · 22 acres

How We Build

Four phases.
One point of contact.

From the first soil sample to the final stripe on the pitch, a single Groundbreak project lead manages every phase, every subcontractor, every inspection.

01

Site Assessment

We visit your acreage, test soil composition and drainage gradients, review zoning restrictions, and deliver a written feasibility report within 5 business days.

1–2 weeks
02

Design & Permitting

Our in-house engineers produce stamped construction drawings and navigate the full permit chain — federal, state, and municipal — so you don't manage multiple agencies.

6–14 weeks
03

Grading & Infrastructure

Heavy equipment sculpts your site to specification. Storm-water systems, electrical conduit, and subsurface drainage go in before any surface material.

4–10 weeks
04

Surface & Finishing

Natural or synthetic turf, track surfacing, court hardscaping, bleachers, lighting, and fencing installed to governing-body regulation.

3–8 weeks
Groundbreak crew operating grading machinery on a raw construction site at dawn, orange vests visible
About Groundbreak

Built on the premise that every community deserves a regulation pitch.

Founded in 2008 by a former municipal parks engineer, Groundbreak has delivered 38 sports facilities across 12 states — from a single-field community park in rural Nebraska to a 22-acre collegiate complex in Austin, Texas.

We hold every certification your grant application or bond measure will require — and we've sat on the other side of that table enough times to know how to write the specifications that get projects funded.

ASBA CertifiedFIFA Quality ProIAAF Level 1ADA CompliantLEED BD+C
Step 1 of 2
Free Site Assessment

Tell us about your project.

Four quick fields — no commitment. We'll review your site parameters and reach out with a realistic scope.

No commitment required. We respond within 1 business day.

Free Download

Facility Planning Checklist

Not ready to talk yet? Download our 24-point pre-construction checklist covering soil testing, drainage planning, permit timelines, and bid documentation.

  • Soil percolation & load-bearing test protocol
  • Drainage gradient requirements by sport
  • State permit timeline benchmarks
  • Bid package documentation checklist
🏛️

Licensed General Contractor

12 state certifications

📋

Bonded & Insured

$10M project coverage

📅

On-Time Delivery

38 of 38 projects

🌱

Sustainable Grading

EPA storm-water compliant